01 Hall Renovations 2008-09
 
 
 
Hall with old front porch
 
 
Hall interior, with Zita
 
 
Old storage room
 
 
Old kitchen (end of June)
 
 
Sink, but no water!
 
 
Removal of old grey water tank and installation of new water and septic tanks
 
 
Wood wall and chimney, stripped bare
 
 
Particle board removed from kitchen
 
 
Insulating alcove
 
 
Looking towards new washrooms and kitchen
 
 
Roxanna and Sheila building stud wall for 2nd layer of insulation
 
 
These small high windows give the only view of the lake from the hall
 
 
New front entry
 
 
Open span and new plywood floor in alcove
 
 
Jack, taking over project manager duties while Bill is on holidays
 
 
Bill, building bay window frame, alcove
 
 
Now THIS is a team that gets things done!!! Roxanna, Sheila and Bill
 
 
Shed roof removed above front steps
 
 
Porch excavations and covering up until the new windows arrive
 
 
Sheila and Dale ready to put gyproc on walls and ceilings
 
 
New wood stove
 
 
Dale working on vapor barrier in bathroom
 
 
New alcove
 